«

»

Nov 30 2016

Assembly and Detail Work

Finally reached the point where the shaping and prep work is finished;  the assembly and detail work begins. First, the peg head and tail stock is glued to the top, then prepped for the back.

head-tail-attachglue

The back is clamped into place and the sides are sanded down thinly.

top-and-backside-prep

The sides are steamed to make them pliable, then glued to the strips and held in place by special clamps.

side-applysides-done

All parts of the instrument are hand trimmed and carefully sanded down. Two coats of polyurethane are hand-rubbed onto the dulcimer. Almost there…

head-closeupfinish-coat

1 comment

  1. Jon G.

    hi Tim,

    It’s really going to be beautiful piece of art work! love the carvings on the peg head too!

    Thanks!

    Jon

    PS – Don’t forget to sign and date it!

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>